Less-than-truckload (LTL) and part-load carriers make money by filling trucks with shipments from many customers. A truck that leaves 90% full on a lane can earn far more than the same truck sold as one full load. A truck that leaves 50% full, or loses a pallet on the way, can lose money.
We compared FTL and LTL in an earlier article. This one looks at the daily work of consolidation: planning, loading, sequencing and keeping every load separate.
Plan by three limits, not one
Trucks run out of capacity in different ways. Heavy goods hit the weight limit; light bulky goods hit volume; palletised goods hit floor positions. A plan has to respect all three at once.
| Shipment | Weight | Volume | Pallet positions |
|---|---|---|---|
| Steel fittings | 6,800 kg | 9 m³ | 6 |
| Furniture | 2,100 kg | 28 m³ | 8 |
| Beverages | 7,400 kg | 11 m³ | 8 |
| Textiles | 900 kg | 14 m³ | 4 |
| Total | 17,200 kg | 62 m³ | 26 |
| Truck capacity | 24,000 kg | 85 m³ | 26 |
| Used | 72% | 73% | 100% |
Check what can travel together
| Food | Chemicals | Chilled | Fragile | |
|---|---|---|---|---|
| Food | ✓ | ✗ | Only if range matches | ✓ |
| Chemicals | ✗ | Check classes | ✗ | Check |
| Chilled | Only if range matches | ✗ | Same range only | ✓ |
| Heavy machinery | ✓ with separation | Check | ✗ | ✗ unless secured |
Sequence the stops
- Use nearest-first as a default, then move time-window customers to fit their windows.
- Plan loading order from the delivery sequence — last delivery loaded first.
- Allow realistic time at each stop for loading, paperwork and waiting.
Allocate the trip cost fairly
To know whether each shipment made money, split the trip cost between the loads on it. Use the limit that the truck actually ran out of.
Keep every load separate
- Own record per load — shipper, receiver, goods, references and price.
- Own stop and arrival time — so delays at one stop are visible.
- Own POD — receiver name and photo for each load, not one signature for the truck.
- Own tracking — each shipper sees only their load, never the others on the truck.
- Own invoice — on that customer’s rate: per kg, per m³, per pallet or per loading metre.
Hubs multiply the benefit
Collection runs bring part loads into a hub or cross-dock; linehauls move consolidated freight between hubs at high fill; delivery runs take it out. Re-measuring at the hub corrects weights and sizes before they cause problems on the next leg.
KPIs for consolidation
Filling trucks is a planning problem with three dimensions, many customers and strict paperwork. Carriers who plan with all three limits visible, sequence stops deliberately and keep every load’s record separate fill more trucks without losing control. A load builder that shows weight, volume and pallets together, inside LTL freight software that keeps each shipper’s load, stop and invoice separate, makes that routine.